Buat estimasi Hardwood Floor Refinishing dalam hitungan menit

Formulir dimulai dengan baris contoh Screen dan recoat dan Sand to bare wood. Edit jumlah dan tarif, lalu gunakan Ubah menjadi estimasi profesional.

Estimasi Hardwood Floor Refinishing

4 baris
SubtotalRp 9.000,00

Perlu akun gratis. Tambahkan data bisnis, kirim ke klien, dan ubah estimasi yang diterima menjadi faktur.

Baris untuk estimasi Hardwood Floor Refinishing

Baris contoh Hardwood Floor Refinishing

Empat contoh Hardwood Floor Refinishing sudah terisi, total 9,000 (contoh) sebelum pajak: Screen dan recoat (per sq ft) (1,800 (contoh)), Sand to bare wood (per sq ft) (3,600 (contoh)), Stain application (per sq ft) (1,000 (contoh)), Polyurethane finish (3 coats, per sq ft) (2,600 (contoh)). Subtotal adalah jumlah kali tarif. Contoh Hardwood Floor Refinishing lainnya ada di Tambah preset Hardwood Floor Refinishing: Air-based low-VOC peningkatan (680 (contoh)), Baseboard shoe Pembongkaran dan reset (225 (contoh)), Stair tread refinish (per tread) (1,190 (contoh)), Gap fill dan patch boards (350 (contoh)), Furniture moving (per ruangan) (375 (contoh)), Dust containment system (275 (contoh)). Semua baris akan mencapai 12,095 (contoh), atau 3,095 (contoh) lebih dari empat baris awal.

  • Stain application (per sq ft). 800 at 1.25 (contoh) comes to 1,000 (contoh). The quantity is square feet of the area you will actually do.
  • Polyurethane finish (3 coats, per sq ft). 800 at 3.25 (contoh) comes to 2,600 (contoh). The quantity is square feet of the area you will actually do.
  • Air-based low-VOC peningkatan. 800 at 0.85 (contoh) comes to 680 (contoh).
  • Baseboard shoe Pembongkaran dan reset. 1 at 225 (contoh) comes to 225 (contoh).
  • Stair tread refinish (per tread). 14 at 85 (contoh) comes to 1,190 (contoh). The parenthetical (per tread) is part of this sample scope. Change it when the job differs.
  • Gap fill dan patch boards. 1 at 350 (contoh) comes to 350 (contoh).
  • Furniture moving (per ruangan). 3 at 125 (contoh) comes to 375 (contoh). The parenthetical (per ruangan) is part of this sample scope. Change it when the job differs.
  • Dust containment system. 1 at 275 (contoh) comes to 275 (contoh).
  • Screen dan recoat (per sq ft). 800 at 2.25 (contoh) comes to 1,800 (contoh). The quantity is square feet of the area you will actually do.
  • Sand to bare wood (per sq ft). 800 at 4.50 (contoh) comes to 3,600 (contoh). The quantity is square feet of the area you will actually do. Polyurethane finish (3 coats, per sq ft) (2,600 (contoh)) and Stair tread refinish (per tread) (1,190 (contoh)) and Dust containment system (275 (contoh)) stay on separate rows.

Jatuh tempo

Screen dan recoat (per sq ft) adalah bagian dari contoh awal 9,000 (contoh). Tuliskan tanggal jatuh tempo yang Anda pakai. Builder tidak mengumpulkan uang.

Apa yang dilakukan convert

Jika Screen dan recoat (per sq ft) sudah sesuai, pilih Ubah menjadi estimasi profesional. Editor membuka baris yang sama. Faktur dibuat nanti dari estimasi yang disetujui.

Estimasi dan penawaran

Klien mencampur estimasi dan penawaran. Pertahankan baris yang sama untuk Screen dan recoat (per sq ft), apa pun istilah di email.

Siap mengirim estimasi profesional?

Daftar gratis dan ubah estimasi Anda menjadi faktur dalam satu klik.